Leland just secured a meaningful piece of walkability funding. As Port City Daily reported on Nov. 6, 2026 (Shea Carver), the Wilmington Urban Area Metropolitan Planning Organization awarded the town $973,600 through its Fiscal Year 2029–2030 Locally Administered Projects Program for a short but strategic multi-use path between South Navassa Road and Loop Road.
If you own or are shopping near Village Road, the Town Gateway District, Sturgeon Creek, or the South Navassa–Loop Road corridor, this award is worth understanding—not as an overnight amenity, but as a funded piece of Leland’s longer mobility plan.
What WMPO Awarded
According to Port City Daily, the award covers preliminary engineering and construction of a 0.29-mile, 10-foot-wide multi-use path from South Navassa Road to Loop Road. The project is intended to improve safe, accessible options for pedestrians and cyclists and to connect to an existing multi-use path plus residential areas that include Village Road, the Town Gateway District, Sturgeon Creek, and future recreational amenities.
Leland treated the path as a high priority in its Integrated Mobility Plan. Port City Daily also notes alignment with the Gullah Geechee Heritage Trail Feasibility Study and the WMPO 2050 Metropolitan Transportation Plan.
Timeline Reality: FY2029–2030, Not Next Month
The fiscal years matter. This is FY2029–2030 Locally Administered Projects Program funding. That means engineering and construction are programmed for future budget years—not a ribbon-cutting this winter. Buyers and sellers should set expectations accordingly: the award strengthens the corridor’s long-term walkability story, but it does not instantly change daily commuting or school-walk patterns tomorrow.
- Funding is secured in the LAP cycle for preliminary engineering and construction.
- Actual design, right-of-way, and build schedules still need to move through town and regional processes.
- Nearby listings can note planned connectivity—without promising a finished path on a date that does not exist yet.
Why a 0.29-Mile Link Matters Locally
Short path segments often do the heavy lifting in growing towns: they close gaps between neighborhoods, commercial edges, and trails that already exist. In Leland’s case, connecting South Navassa Road to Loop Road is less about a scenic loop for tourists and more about everyday links—residents walking or biking between housing, the Gateway District, Sturgeon Creek amenities, and the wider multi-use network as it fills in.
For homeowners, that kind of gap-filling can support:
- Safer non-car trips for short errands or recreation.
- Stronger connectivity marketing for homes near Village Road and South Navassa Road.
- Alignment with Leland’s broader mobility and heritage-trail planning—not a one-off sidewalk stub.
Regional Context (Briefly)
WMPO’s Locally Administered Projects Program funds a mix of roadway, transit, and pedestrian/bicycle improvements across the metro area. Port City Daily notes other LAP awards in this cycle include about $921,600 for Carolina Beach’s S. Lake Park Boulevard Sidewalk; about $1.696 million for Wilmington New Centre Drive sidewalks and pedestrian signals; and about $1.84 million for Medical Center Drive sidewalk and roadway improvements. Those projects show the same regional push toward safer walking and biking—but each has its own timeline and local impact.
What This Means If You Are Buying or Selling in Leland
Buyers: Ask how a listing sits relative to existing multi-use paths and to this South Navassa–Loop Road segment. Walkability language should match maps and plans, not wishful marketing. If you prioritize bike/ped access, treat this award as a positive signal with a multi-year delivery window.
Sellers near the corridor: You can honestly mention planned connectivity and Leland’s mobility priorities. Avoid implying the path is already built or that home values will jump because of a future-year engineering award. Serious buyers will check the FY2029–2030 framing themselves.
Investors and relocators: Leland continues to add housing and commercial activity along major corridors. Incremental trail and path funding is part of how the town tries to keep that growth usable on foot and by bike—not only by car.
FAQ
How much funding did Leland receive?
According to Port City Daily (Nov. 6, 2026), WMPO awarded Leland $973,600 in FY2029–2030 LAP funding for preliminary engineering and construction of the path.
Where will the path run?
It is planned as a 0.29-mile, 10-foot-wide multi-use path from South Navassa Road to Loop Road, connecting toward existing paths and residential areas including Village Road, the Gateway District, and Sturgeon Creek.
When will it be finished?
The award is tied to Fiscal Year 2029–2030 programming. Treat delivery as a future-years project unless the town publishes a more specific construction schedule later.
Does this raise my home’s value overnight?
No responsible agent will invent that number. Better connectivity can support long-term livability, but pricing still follows current comps, condition, and buyer demand—not a future path alone.
Talk With a Local Team
Curious how Leland’s mobility projects stack up against other Brunswick County corridors—or whether a Village Road, South Navassa, or Gateway District home fits your next move? Contact Aspyre Collective for a clear, local read on walkability, timelines, and what current listings actually offer.



